Kingisepp 2 Project - Ammonia and Urea Production Plant
EPC, Supply of HVAC systems for 22 buildings.
Locations: Kingisepp, Russian Federation
Start: 2021
Planned Completion Date: Q3/2023
Client: EUROCHEM
Main Contractor: Maire Tecnimont SpA
The PROJECT is related to the construction of the new facilities in the Kingisepp Phosphorit Complex.
Activity Basis Scope of Supply:
- Engineering
- Procurement & Fabrication of HVAC System
- Installation
- Commissioning and Hand Over
Sub-discipline Basis Scope of Supply:
- HVAC equipment
- Air-Conditioning
- Ventilation
- Heating
- Air distribution ducting systems
- HVAC piping systems
- Thermal insulation for ductwork and pipework
- Electrical systems for HVAC equipment
- HVAC automatic control systems
- All supports, skids, hangers, clamps, etc.
- All instrumentation and controls
- Acoustic and vibration treatment
Project in brief:
- 22 Buildings in Ammonia & Urea Facilities
- 41.000 sqm total area
- 46 AHU
- 25 ACCU
- 184 Fans