TANAP (Trans-Anatolian Pipe-line Project)

TANAP (Trans-Anatolian Pipe-line Project)

Trans-Anatolian Pipe-line (TANAP) Compressor and Metering Stations, Mechanical Works Relating to HVAC, Plumbing and Fire Protection Systems.

Locations: Ardahan, Eskişehir, Çanakkale, Edirne / Turkey.
Period: 2016 - (ongoing) Planned Completion
Date: Q4/2019
Client: TANAP International Consortium / Tekfen

TANAP Compressor and Metering Stations are located in various sites in Turkey as part of the relevant pipeline project. Total number of buildings within the scope of contract are sixty six. Type of buildings consists of process and non-process buildings, whereas area classification varies from “safe” to “zone1, IIB, T3”.

The scope of work consists of partial engineering, material approvals and supply, installation and commissioning of HVAC, sanitary and plumbing systems, fire fighting systems.

Activity Basis Scope of Supply:

  • Engineering
  • Procurement
  • Construction
  • Commissioning and Hand Over

Sub-discipline Basis Scope of Supply:

  • HVAC Systems
  • Heating and Chiller System Piping
  • Pneumatic Systems Piping
  • Copper Piping
  • Gaseous Fire Suppression System (Argon)
  • Hydronic Fire Suppression System
  • Sanitary Plumbing System
  • Local Control System of HVAC System
  • Gaseous Fire Suppression System Control Systems

Main Material Scope of Supply:

  • 66 Buildings
  • 5 Locations
  • 72.000 WDI Pipe Welds (1/2” to 16”)
  • 23.400 meters threaded piping
  • 42.000 sqm Light Gage Ductwork
  • 6.400 sqm Heavy Gage Welded Ductwork
  • 88 Air Handling Units
  • 12 Low Pressure Hot Water Boilers
  • 9 High Pressure Hot Water Boilers
  • 6 Air Cooled Water Chillers with
  • Screw Compressors
  • 256 Close Control Air Conditioners
  • Complete with Copper Piping (For Telecoms and Data Centers)
  • 3.254 Fire Dampers and Fire & Gas Dampers
  • 256 Blast Dampers
  • 132 HVAC Control Panel
  • 132 HVAC MCC Panel
TANAP (Trans-Anatolian Pipe-line Project)