Future Growth Project Mess Hall and Office Facilities

Future Growth Project Mess Hall and Office Facilities

Mess Hall Future Growth Project / Wellhead Pressure Management Project.
Location: Tengiz / Kazakhstan
Period: 2017 - (ongoing)
Planned Completion Date: October 2019
Client: TCO (Tengiz Chevron Oil) / Gate

The scope of work consists of engineering, procurement, construction and commissioning of HVAC (including automation) works of indicated 17 Mess Halls, in accordance with the current editions of international codes, standards and project specifications.

Activity Basis Scope of Supply:

  • Engineering
  • Procurement
  • Construction
  • Commissioning and Hand Over

Sub-discipline Basis Scope of Supply:

  • HVAC Systems
  • Cold Room Refrigeration Systems
  • HVAC Systems Power Supply System
  • HVAC System Control and Instrumentation

Project in brief:

  • 17 Buildings
  • 7.862 meters copper piping
  • 19.125 sqm Light Gage Ductwork
  • 34 Air Handling Units
  • 68 Direct Expansion Condensing Unit
  • 114 Extract Fans
  • 34 HVAC Control Panel
  • 34 HVAC MCC Panel
Future Growth Project Mess Hall and Office Facilities