Future Growth Project Office Facilities

Future Growth Project Office Facilities

Mess Hall Future Growth Project / Wellhead Pressure Management Project.
Location: Tengiz / Kazakhstan
Period: 2018 - (ongoing)
Planned Completion Date: October 2019
Client: TCO (Tengiz Chevron Oil) / Gate

The scope of work consists of engineering, procurement, construction and commissioning of HVAC (including automation) works of indicated 5 office buildings, in accordance with the current editions of international codes, standards and project specifications.

Activity Basis Scope of Supply:

  • Engineering
  • Procurement
  • Construction
  • Commissioning and Hand Over

Sub-discipline Basis Scope of Supply:

  • HVAC Systems
  • Cold Room Refrigeration Systems
  • HVAC Systems Power Supply System
  • HVAC System Control and Instrumentation

Project in brief:

  • 5 Buildings
  • 1.562 meters copper piping
  • 3.805 sqm Light Gage Ductwork
  • 10 Air Handling Units
  • 20 Direct Expansion Condensing Unit
  • 24 Extract Fans
  • 10 HVAC Control Panel
  • 10 HVAC MCC Panel